All the modules are now with John and we are slowly assembling and testing each and every single module to ensure that we get the expected level of performance out of these things. Currently we have 4 or 5 transmitter modules assembled and tested. Unit ID's are also now being assigned.
Daniel
Dragon Link - Production Run #1
-
- Site Admin
- Posts: 2449
- Joined: Wed 25 Feb 25 2009 8:00 pm