Page 1 of 2
Dragon Link - Production Run #1
Posted: Wed 27 May 27 2009 4:03 pm
by Daniel Wee
PCBCART has sent out the PCB (27 May 2009) so I expect to get them in about 10-days or so.
RF Modules will be ready for delivery about mid-June, so about 2 to 3 weeks from now.
Daniel
Re: Dragon Link - Production Run #1
Posted: Thu 28 May 28 2009 1:12 pm
by John Lee
35 Teko cases just shipped out of Pennsylvania, USA today (May 27th, 2009) and on it's way to Duncan, CND.
Re: Dragon Link - Production Run #1
Posted: Sat 30 May 30 2009 11:49 am
by Daniel Wee
Bought 90% of all the needed components and parts.
PCB arrived.
Daniel
Re: Dragon Link - Production Run #1
Posted: Tue 02 Jun 02 2009 6:08 pm
by Daniel Wee
Some assembly underway now with components on hand:-
- IMG_0380a.JPG (92.13 KiB) Viewed 25290 times
- IMG_0379a.JPG (104.43 KiB) Viewed 25290 times
Daniel
Re: Dragon Link - Production Run #1
Posted: Sat 06 Jun 06 2009 12:28 pm
by Daniel Wee
Had to cancel a Mouser order (#2) and re-order from Farnell. Still waiting for resonators.
Daniel
Re: Dragon Link - Production Run #1
Posted: Sat 06 Jun 06 2009 9:22 pm
by Daniel Wee
25 TX and 30 RX boards done, 5 board could go either way. Most still awaiting resonators - probably next week:-
- IMG_0392a.JPG (121.13 KiB) Viewed 25284 times
25 PSU's done - waiting to be wired up:-
- IMG_0394a.JPG (90.31 KiB) Viewed 25285 times
Wires getting prepared (at 5 bucks an hour):-
- IMG_0396a.JPG (63.67 KiB) Viewed 25284 times
Daniel
Re: Dragon Link - Production Run #1
Posted: Tue 16 Jun 16 2009 8:22 pm
by Daniel Wee
Got news that the second board is in the mail and should arrive in about a week - or maybe this Friday (but I'm not around by then).
Daniel
Re: Dragon Link - Production Run #1
Posted: Wed 17 Jun 17 2009 10:54 am
by John Lee
Re: Dragon Link - Production Run #1
Posted: Sat 04 Jul 04 2009 12:48 am
by Daniel Wee
20 Receivers assembled, fused and programmed. They just need to be calibrated and tested, then have heatshrinking applied.
- IMG_0553a.JPG (83.19 KiB) Viewed 25269 times
Daniel
Re: Dragon Link - Production Run #1
Posted: Mon 06 Jul 06 2009 10:21 pm
by Daniel Wee
My half of the TX boards all done:-
- IMG_0615a.JPG (73.85 KiB) Viewed 25263 times
Daniel