Page 2 of 2

Re: Dragon Link - Production Run #1

Posted: Tue 28 Jul 28 2009 10:27 pm
by Daniel Wee
All the modules are now with John and we are slowly assembling and testing each and every single module to ensure that we get the expected level of performance out of these things. Currently we have 4 or 5 transmitter modules assembled and tested. Unit ID's are also now being assigned.

Daniel